Day 18 – Floor joists spanning the loft

Now that the other steel beam has gone in it allowed for the floor joists to span across the loft now and two thirds of those have been done today. I was also told that the dormer should be going up Thursday and Friday this week, which was good news.

More floor joists added

Image 4 of 6