All the floor joists have now been put in place and an area made clear where the staircase will be going. Also bricks have been removed where the steel ridge beam will be going to support the roof as well as the bathroom waste pipe has been put in place behind the steel beam. I also added some more AV and Cat6 cables going to the front room and conservatory.